Cher hydroelectric power station (18)
The Arnon river, near VIERZON, a 280 kw-CODOA 250 kw-H07 PMB hydroelectric Power station-2-component contract until February 2036-
H = 3, 56m-flow rate: 8 m3/s
Currently equipped with a Kaplan turbine of 96 kW and a fountain turbine of 75 kW
Ecological continuity to be achieved in the years to come.
Price: 690 000 € fees included